Please be advised that beginning on or about Monday, June 3rd the following roads: Westminister Ave (Maple to Somerset), Poplar Ave (Maple to Myrtle) and Cedar Ave (Centre St to Penn St), are scheduled for concrete, improvements, and the removal and repair of the existing roadway, a new asphalt surface course will be placed. No vehicles are to be parked in the roadway from 7:00 a.m. to 6:00 p.m. During most times the roads will be open to local traffic only.
Published in
Boro
Leave a comment
Make sure you enter all the required information, indicated by an asterisk (*). HTML code is not allowed.